top of page
BIMCAP_White.png
Scope of Work

BIM Authoring, As-Built, Scan to BIM, Clash Management, BIM Specs, LOD500, BIM Modelling

Project

The existing Riverside Stand at the Craven Cottage in Fulham is to be demolished and redeveloped. The newstand will have an increased seating capacity for match day football arranged in two tiers, with accommodation associated with modern sports uses.

BIMCAP was engaged with the Interior Designer to prepare the 3D BIM modelling at LOD 200. We are also tasked with conducted clash analysis on a regular basis to provide a clash-free model.

Location

Fulham, United Kingdom

Year

2023

Client

Undisclosed

GFA

18,000 sqm

Fulham Stadium

bottom of page