top of page
BIMCAP_White.png
Scope of Work

Digital Twin, 7D Facility Management, Virtual Reality, 4D Construction, Interior Design

Project

For the new third runway, we modeled various components of the architecture, structure and MEP, including tunnels for automated people movers and BHS, and produced Tender Docs at LOD350.

We were responsible for the coordination between all consultants to resolve clashes. We used BIM for ATC sightline checks and walkthrough checks. The BIM model was also used for the production of 2D drawings from the 3D model.

Location

Hong Kong

Year

2024

Client

Undisclosed

GFA

480,000 sqm

Third Runway Concourse

bottom of page