Scope of Work
Digital Twin, 7D Facility Management, Virtual Reality, 4D Construction, Interior Design
Project
For the new third runway, we modeled various components of the architecture, structure and MEP, including tunnels for automated people movers and BHS, and produced Tender Docs at LOD350.
We were responsible for the coordination between all consultants to resolve clashes. We used BIM for ATC sightline checks and walkthrough checks. The BIM model was also used for the production of 2D drawings from the 3D model.
Location
Hong Kong
Year
2024
Client
Undisclosed
GFA
480,000 sqm